Worker fell off a building and dies, labor union rushed to make laws to control work during bad weather conditions

A young worker, during typhoon signal no.three, worked on erecting the outside shelter. It was suspected that when he unlocked his safety belt to change his location, he slipped and fell straight down to the first floor platform.

Points to be caution:

  1. Workers should not be allowed to work in bad weather conditions. A contractor with a good reputation should have strict rules and regulations for their workers, not neglect safety and allow the construction to be in any risk.
  2. There are certain interior design companies and self-employed workers who will not purchase insurance due to various reasons or being not qualified enough resulting in lack of protection. A well established design company will have a better mindset about insurance, thus a more complete protection like Employee Insurance, Third Arty Liability, Engineering Insurance, Property All Risk, etc.
  3. Property owners should buy insurance for the construction as well. On one hand it can prevent responsibility if the contractor does not purchase insurance. On the other hand, if the contractor's insurance has different protections, it adds on making it more complete.
  4. Workers must follow all the safety rules and regulations when building a shield: building a standard shield, wearing a proper safety belt, and have it secured in place to prevent falling.
  5. A full body harness is safer than a half body harness because it spreads out the weight of the person equally minimizing damage.
  6. The more understanding of safety, the more protected you are.
  7. If a worker is found to work in high levels without any safety equipment, inform the Labor Department immediately.


Credits: Apple Daily HK

Redirected on: August, 5th, 2009

  Construction Information Area Total 204 Previous Page  Go to page Next Page  
 
Erection of unauthorised building works, resulting to Pakistan man injured by 100kg cement
Worker fell off a building and dies, labor union rushed to make laws to control work during bad weather conditions
Scaffolding worker falls to his death because of the sun
Window without window grill leads to the injury of a child
Glass of newly installed shower screen breaks and injures
 
           
 
Construction worker falls and is in critical condition due to not wearing a safety belt
Hundred pound closet collapsed on bed
Pakistan Refugee falls and dies from repairing air conditioning
Male infant in critical condition after sleeping with mom
Long term usage of dehumidifier leads to burning of home
 
       
  設計情報多面睇   專業管理文化 優質服務隊   HKMA 優質管理獎   逆境自強 2020
       
  DIC 勇奪經濟日報及 TVB 的傑出 ESG 企
業獎及環境、社會及管治大獎特別嘉許獎
  風動式雙開板止回風閥   星級特派員陸詩韻 - 九龍塘豪宅   星級優勢卓越品質
       
  全天候 24 小時網上追蹤系統   星級特派員陸詩韻 - 沙田納米公屋   傢俬製作流程   星級特派員陸詩韻 - 開聯工業中心
       
  最新 ISO 國際標準 優質綜合管理認證   嚴謹工程查驗   3D 模擬傢俬訂造參考   星級特派員陸詩韻 - 雅鑾閣
       
  裝修界黑工|消費者小心法律風險/爛尾 黑工小心被賣豬仔   對光顧的公司聘請黑工知情與否
消費者均有機會觸動法律煩惱
  豪門 Don't 裝修爛   錦英苑 Don't 裝修爛 (爆水管事件)
       
  工程細節講解 水電工程篇   工程細節解構 木工油漆篇   工程細節講解 泥水工程篇   鋁窗試水 嚴謹過程
       
  裝修爛尾局中局 判頭留下空頭支票苦主追訴無門 (轉載自 TVB 東張西望)   家居裝修小心中伏
(轉載自 TVB 東張西望)
  裝修「爛尾」起糾紛 仲裁判決顯不公
(轉載自 有線新聞)
  爛尾裝修苦業主 (轉載自 TVB 東張西望)
       
  星級特派員陸詩韻 - 地利根德閣   防疫易 Biozone & VeeCare 空氣清新機
(星級特派員陸詩韻)
  設計全面睇 大埔獨立屋
(星級特派員陸詩韻 + 莊鍶敏)
  竹園南邨 Don't 裝修爛
Shatin
Tai Po
Sai Kung
Northern District
Yuen Long
Kwai Tsing
Tsuen Wan
Tuen Mun
Kowloon
HK Island
Outlying Islands
Macau
Mainland
01 01








✨ The operation of Design Information Centre follows the strict standard of ISO, we have been upholding the management philosophy of unity❤, continuous improvement and pursuit of excellence👍, in order to provide service with high quality to our customers. ✨

✨ Design Information Centre, a subsidiary of Lai Group Holding Company Limited, was successfully listed on the HKEX Growth Enterprise Market (Stock Code: 8455) 📈 In times of economic downturn, clients should have chosen a good company carefully. As a decoration project involved a large amount of money, pick the company with strong capability can guarantee the client’s confidence.

💪。

✨Design Information Centre can offer interest-free installment choices of several banks🏦. It is because of our well-developed foundation and stable financial condition💪, we are able to obtain back-ups from different banks. Therefore we are able to offer 12-month, 24-month or 36-month interest-free installments to our customers.💰💰

✨All designers in DIC gained professional training and everyone have their own personal style and strength📝. However, they will not solely rely on their personal capabilities, but also follow the management culture by the company and all the strict monitor guidelines, management and review process. Also, they collaborated with every department included Audit Department, Engineering Supervision, Construction Team, and Furniture Production Team and examine work in different department to finish the project. Providing a perfect and integrated service to our clients by using the power of teamwork. 🖥

✨ In order to protect customers’ interests and avoid violating the Prevention of Bribery Ordinance💸, there are some friendly reminders: ❤

✔ Our company staff and suppliers are prohibited to receive cash or money transfer to any personal account🙅💵. Our company will not require customers to pay cash for any discount💵

✔ All the invoices of our company are monitored by our system💻, to ensure that there is no bypassing of the company.

✔ The company names stated on the invoices are 📜 ‘豪迅有限公司’ or ‘Globe Sense Ltd’ or ‘Design Information Centre’, to ensure that all invoices are issued by our company👨🏻💼.

✔ Payment only by cheque, credit card or bank transfer to the company account💁 (HSBC 116-488909-838/ Hang Seng Bank 249-182122-001/ Bank of China 012-688-0-008218-0). 💁

✔ Cheque payable to ‘豪迅有限公司’ or ‘Globe Sense limited’. Please summit crossed cheque and delete ‘holder or Bearer’, we are not responsible for any other payment methods and accounts. 🙅

✨ Clients should have checked if the payment method is the same as above when patronize decoration design engineering in DIC✔✔. Our company will not take the responsibility to provide the insurance cover (e.g. labour insurance and the warranty of every project), 3-year structural warranty of the residential project and 1-year structural warranty of the commercial project if the project did not follow the above payment request. Without the insurance cover and structural warranty, it will be hard to keep the engineering quality and also an incomplete project will appeared🤯, and client may carry unnecessary loss. 💸

✨ DIC’s management culture has been upholding ‘Honesty’, ‘Righteousness’ and ‘Unity’, these three words are short but with profound meanings.👨🏻🔧,We aim at bringing high quality, perfect and reliable services to our customers with our teamwork and strict management.😊💪🏻. If you find out the payment method is different from the above stated, or have any confusion of the design or project, you are welcomed to provide relative information to Design Information Centre ✉

☎ Report Hotline: 969 888 69 Kevin Chan, or email to [email protected]📧. We appreciate for your valuable opinions, thank you. 🙏🏻

✨We will follow up the information provided by you 👮‍♂, and give relative reward to you for your help 🙏according to the facticity of the provided information content✍ (for example, your flat’s address, the date, information of the designers, communicating records, phone number, receipts provided by the designers, etc.), all the information provided by you will be kept secret. ㊙